Farm Machinery Field Capacity and Efficiency

Report an issue

Estimate area worked per unit time and the time breakdown for parallel passes across a rectangular field.

An estimate for straight, parallel passes across a rectangular field. Each pass covers the full length of the selected side, with one turn at each end between passes.

Enter the working width before subtracting overlap.

Travel speed during straight passes, excluding turns and stops.

Each pass covers the full length of the selected side, with passes arranged across the other side.

Must be 0 or greater and less than the working width. Enter 0 explicitly if there is no overlap.

Calculated for number of passes − 1 turns. If this includes waiting, do not count that time again as downtime.

Expected refilling and unloading time for the entire field. Enter 0 if not applicable.

Stops within the field for adjustments, checks, and similar work. Enter 0 if not applicable.

Results

Results update automatically when the required values are entered.

Method, applicability and sources

Calculation method

Field area A = long side×short side÷10,000 (ha). Theoretical field capacity Ct = working width W (m)×straight-line speed V (km/h)÷10 (ha/h). Let L be pass length, B the crosswise dimension, O the overlap, and D = W−O the width gained per pass. Number of passes N = 1 when B≤W; otherwise N = 1+ceil((B−W)/D). Straight-line time (minutes) = N×L÷(V×1,000)×60. Turns = N−1; turning time (minutes) = (N−1)×seconds per turn÷60. Total field time T (minutes) = straight-line time + turning + refilling + other downtime. Effective field capacity C = A÷(T/60) (ha/h). Field efficiency Ef = C÷Ct×100 (%). Any remaining edge strip counts as one full-length pass.

Worked example (hypothetical values)

For a 120 m by 60 m field, working width 3 m, speed 6 km/h, passes along the long side, overlap 0.2 m, turning time 30 seconds/turn, refilling 5 minutes, and other downtime 3 minutes: 22 passes and 21 turns require 26.4 minutes of straight travel and 10.5 minutes of turning, totaling 44.9 minutes. Area is 0.72 ha, theoretical capacity 1.8 ha/h, effective capacity approximately 0.9621 ha/h, and field efficiency approximately 53.45%.

Applicability and limitations

An estimate for a single rectangular field with known dimensions, full-length back-and-forth passes, and specified time losses. Excludes irregular fields, obstacles, uncultivated strips, separate headland operations and turning paths, machine acceleration and deceleration, slopes, travel outside the field, automatic estimates of refill counts from material capacity, yield, safety, and accessibility.

Method and sources

Method: E684 rectangular parallel passes v1.0(2026-11-14). Data recorded: 2026-11-14.