Food Delivery Deadlines and Shelf-Life Inventory (Japan)
Organize remaining shelf life and inventory categories by production lot according to a trading partner's delivery and sales deadline rules.
Calculates dates only from verified labeled dates and agreed trading rules. Does not determine shelf-life duration or food safety.
Results
—items
- Total inventory quantity
- —items
- Quantity past the delivery deadline (including past the labeled date)
- —items
- Quantity due on the reference date or within 7 days
- —items
- Quantity past the labeled date
- —items
Results update automatically when the required values are entered.
Method, applicability and sources
Calculation method
The production date is elapsed day 0. Period N (days) is the calendar-day difference between the labeled date and production date. For an elapsed fraction a/b, deadline = production date + ⌊N×a/b⌋ days. For a required remaining fraction a/b, deadline = production date + [N−⌈N×a/b⌉] days. If the reference date equals the deadline, 0 days remain and the lot is included as within the deadline; it becomes overdue the following day. In Japan, the 1/3 rule is a trading practice, not a statutory requirement. Months, business days, and times of day are not considered.
Worked example (hypothetical values)
Example: production date 2026-04-01, verified labeled date 2026-05-01 (30 days apart), delivery rule 'no more than 1/3 elapsed,' sales rule 'no more than 2/3 elapsed,' reference date 2026-04-10, and quantity 120 items. The delivery deadline is April 11 (1 day remaining); the sales deadline is April 21 (11 days remaining); 21 days remain until the labeled date.
Applicability and limitations
Food inventory lots with verified full production and use-by or best-before dates and quantities in the same unit. Does not set use-by or best-before dates, assess food safety, or determine legal compliance. Excludes year-and-month-only dates, month-based rules, business days, times of day, and trading-partner-specific exceptions.
Methods used
- Delivery and sales deadline allocation (Integer-day and rounding rules v1 specified in this calculator): scope Only individual lots with full calendar dates and the selected trading rules; region JP
Method and sources
Method: Calendar-date and fraction rules v1 (2026-11-13; production date is day 0; elapsed days rounded down; required remaining days rounded up). Data recorded: 2026-11-13.