Braking and Stopping Distance Comparison
Compare theoretical stopping distances under 2 sets of driving conditions.
Results
—m
—m
- Stopping-distance difference (B−A)
- —m
- Scenario A: reaction distance
- —m
- Scenario A: braking distance
- —m
- Scenario B: reaction distance
- —m
- Scenario B: braking distance
- —m
Results update automatically when the required values are entered.
Method, applicability and sources
Calculation method
Convert speed V(km/h) to v=V÷3.6(m/s). Reaction distance during time t(seconds) is d_r=v×t. For tire–road longitudinal friction coefficient f (dimensionless) and travel-direction grade G(%; uphill +, downhill −), assume constant deceleration a=9.81×(f+G÷100)(m/s²). If a>0, braking distance d_b=v²÷(2a). Stopping distance D=d_r+d_b; scenario difference=D_B−D_A. If v>0 and a≤0, no finite stopping solution exists. At v=0, distance is 0 m. Distances display 3 decimal places, without intermediate rounding.
Worked example (hypothetical values)
Scenario A: 36 km/h (10 m/s), 1.5-second reaction time, friction 0.5, and 0% grade give 15 m reaction distance, approximately 10.194 m braking distance, and 25.194 m stopping distance. Scenario B: the same speed, reaction, and friction on a 10% downgrade give approximately 12.742 m braking distance and 27.742 m stopping distance. Difference: approximately +2.548 m.
Applicability and limitations
Distance comparison assuming specified speed, reaction time, effective friction coefficient, and constant longitudinal grade. Not for vehicle/load/tire/ABS/road braking-performance testing, aerodynamic drag, brake buildup, changing grades, collision-avoidance assessment, or certification of legal safe speeds or road design sight distances.
Methods used
- Constant-deceleration stopping distance using friction coefficient and grade (FHWA-HRT-04-135 (2005) Fig.39/v1): scope Constant speed during reaction, followed by constant deceleration from friction and grade; region General mechanics estimate
Method and sources
Method: FHWA FHWA-HRT-04-135 (2005); MLIT, Road Structure Ordinance (3), p.87 (checked 2026-11-13) / v1. Data recorded: 2026-11-13.