Ramp Slope, Length, and Rise
Convert rise, horizontal run, and slope for a straight ramp with a constant gradient, and calculate dimensions for an inline flight-and-landing layout.
Rise and horizontal run are calculated in the same cm unit. The flight layout is a dimensional estimate with inline landings and does not assess compliance with facility-specific standards.
Results
—m
—%
- Angle above horizontal
- —°
- Rise : horizontal run (1:N)
- —
- Rise
- —cm
- Horizontal run of the sloping sections
- —m
- Number of ramp flights
- —flights
- Number of intermediate landings
- —landings
- Total horizontal run including landings
- —m
- Total travel-surface length including landings
- —m
Results update automatically when the required values are entered.
Method, applicability and sources
Calculation method
Let H be rise (cm) and R the horizontal run of the sloping sections (cm). Slope (%) = 100H/R; N in 1:N = R/H; angle (°) = atan2(H,R) × 180/π; sloping length (cm) = hypot(H,R). For slope inputs, use H/R = p/100 for %, H/R = 1/N for 1:N, or H/R = tan(θ) for an angle. Flight layout: n = max(1, ceil(H/hmax)), with n − 1 intermediate landings and equal rise and run in each flight. Total horizontal run = R + (n − 1)L; travel-surface length = sloping length + (n − 1)L. H = 0 with R >0 is level; R = 0 is not treated as a ramp.
Worked example (hypothetical values)
For a rise of 50 cm and slope of 1:12, horizontal run = 50 × 12 = 600 cm (6 m), sloping length = √(600² + 50²) ≈6.0208 m, slope ≈8.3333%, and angle ≈4.7636°.
Applicability and limitations
Checking planned dimensions of general ramps. Users specify criteria applicable to the facility. Excludes automatic legal compliance checks, landing width and turning space, switchback layouts, actual site footprint, end clearances, handrails, ramp width, slope transitions, and construction tolerances.
Methods used
- Straight constant-slope ramp conversion and equal flights separated by landings (Geometric calculation v1.0 (2026-11-13)): scope Assumes a straight horizontal projection, constant ramp slope, and level landings placed in line with travel; region JP
Method and sources
Method: Right-triangle geometry v1.0 (2026-11-13). Slope and landing terminology references Article 6 of Japan's Ministry of Land, Infrastructure, Transport and Tourism Ordinance No.114 (2006).. Data recorded: 2026-11-13.