Japan: Building Coverage, Floor Area Ratio and Setbacks
Calculate reference building-footprint and FAR-counted floor-area allowances from verified site conditions and designated ratios, and compare the effect of road setbacks
Arithmetic results based on verified road classification, boundaries, regulatory values and road width. Road setback areas are excluded from the site, and the floor-area allowance covers only area counted toward FAR. The results do not establish buildability or the actual total floor area.
Results
—m²
—m²
- Calculated site area after setback
- —m²
- Applied floor area ratio limit
- —%
- Floor area ratio limit based on road width
- —%
- Hypothetical site area before excluding the setback
- —m²
- Hypothetical building-footprint allowance without setback
- —m²
- Hypothetical floor-area allowance without setback
- —m²
- Building-footprint allowance difference due to road setback
- —m²
- Floor-area allowance difference due to road setback
- —m²
Results update automatically when the required values are entered.
Method, applicability and sources
Calculation method
A0 = site area before setbacks and exclusions; S = verified road setback area; E = other excluded area (m²). Calculated site area after setback A = A0 − S − E. Let C be building coverage ratio, F the designated floor area ratio (%), W the road width used under Article 52 (m), and k the verified coefficient. If W < 12 m, road-based FAR R = 100 × W × k (%), and applied FAR G = min(F, R). At 12 m or wider, G = F, with no reduction based on road width. Building-footprint allowance = A × C/100; FAR-counted floor-area allowance = A × G/100. The hypothetical no-setback comparison uses A0 − E under the same ratios and road conditions; setback differences are S × C/100 and S × G/100, respectively. Intermediate calculations are not rounded; displayed values use up to 3 decimal places. Differences are calculated from underlying values rather than by subtracting rounded displays.
Worked example (hypothetical values)
Example: site area before setback 200 m², road setback 10 m², other exclusions 0 m², building coverage ratio 60%, designated FAR 200%, fronting road width 4 m and coefficient 0.4. Applied FAR is 160%, calculated site area 190 m², building-footprint allowance 114 m² and floor-area allowance 304 m². Hypothetical no-setback allowances are 120 m² and 320 m², with differences of 6 m² and 16 m².
Applicability and limitations
Estimates for sites in Japan with one verified set of designated ratios and road conditions, and known excluded areas without double counting. Does not determine road classification, centerline, required setback width, boundaries, effective road width, zoning or eligibility for relaxations. Does not assess sites spanning different regulations, multiple fronting roads, statutory exceptions, floor areas excluded from FAR, slant-plane limits, height, shadow, road-frontage or fire-safety requirements. It is not a determination of buildability or building confirmation.
Method and sources
Method: General principles of Japan's Building Standards Act, Articles 42(2), 52 and 53 / Shizuoka Prefecture material updated 2023-01-11 and Yokohama City material updated 2024-08-13. Data recorded: 2026-11-13.
- Shizuoka Prefecture: Glossary (2), Overview of Building Form Restrictions, updated January 11, 2023 (area ratios and fronting-road width)
- Yokohama City: Areas with Relaxed Floor Area Ratio Limits Based on Fronting-Road Width, updated August 13, 2024 (conditions and designated areas for coefficient 0.8)
- Yokohama City: Designated Road Map Legend, roads under Article 42(2) (setback areas excluded from site area)